MK DONS STADIUM

“E P Hayes provided quality, skilled labour, who worked efficiently and productively for the 14 months they were with us. They were well-equipped with the necessary tools and skills to complete the project to a very high standard, whilst maintaining high standards of safety for themselves and those around them.

The design and construction of the Milton Keynes Dons Stadium produced a number of unique challenges for the reinforced concrete specialist contractor. E P Hayes were particularly innovative in coming up with efficient, cost effective solutions to all of the challenges that they were presented with. Their proactive, positive approach to problem solving was
very refreshing.

On a personal level, I found Eddy Hayes professional and supportive to his site team and in his dealings with the client - he was on-site almost every day and provided a level of supervision that went beyond the usual expectations within the industry. All in all, an excellent job!”

Kevin Underwood, Director
Buckingham Group Contracting Ltd.

Steps where seats will be situated: Total of 9000 linear metres (about 6 miles) of steps.3000m3 of concrete in the steps and another 2500m3 elsewhere on the job.The blue forms that you see in the pictures were made one-off to our specific design, which allowed for the chamfer at the top to be adjusted vertically, as the steps actually increase in height as they go up the terracing, so that they all appear the same height from pitch level.Approximately 150 metres of step poured every day.All steps received a power-floated finish using a specially adapted power float that allowed us to finish right up to the front and back of the steps.
Tony, Pete Winkleman (‘Chairman
of Milton Keynes Dons’ ) and Eddy

We’re very proud to have been associated with Pete Winkleman’s MK Don’s Stadium for 14 months.

“These guys are great – flexible, professional and enthusiastic. I’ll be passing more work their way!”
Pete Winkelman


LASER CIVIL ENGINEERING


“E P Hayes worked for us on the installation of the retaining walls on our Decimus Park, Tunbridge Wells Project. They worked together with the structural engineer in the design of the pre-cast units.

Due to the limited space available between our industrial units, they suggested we look at a system of selfsupporting units using a geo-fabric cast into the rear of the units, which is rolled out and backfilled in layers. This system allowed us to use much thinner walls than would normally be expected.

This was the start of an extremely helpful attitude, which continued right through to the agreement of their final account. They worked conscientiously and safely at all times in very difficult conditions. They co-ordinated the crane visits and load deliveries very well thanks to hands-on management at director level, whilst their site operatives were capable and knowledgeable with regard to their specific duties.

A first class service that I will definitely be using again.”

Ed Burke, Project Manager




 